



































































































































































































































































Datagest
Software
Gibitre Software
Platform
Smart Test
Identification
RheoCheck
Software
Mooney
Check - Software
Density
Check - Software
Hardness
Check - Software
Tensor
Check - Software
TR_Test -
Software
Brittleness
Check -
Software
PressCheck
Software
Compression
Set -
Software
Company Connection
Software
Gibitre
Software Installer
Maintenance and Calibration Service
ISO 17025 Accredited Calibration
Remote Assistance Service
Support request form



















































































































































































































































































































































Italiano
English
Español
Français
Deutsch
Português
Polskie
Čeština
Magyar
Русский
Türk
中文
日本人
한국어
Arab










































Up to 40 cycles can be stored in the PLC.
The cycles can be saved in the Gibitre Standard database through the Gibitre_Press_Control software.

Each cycle allows you to enter up to 30 operations of:
- Mold opening
- Mold closure
- Wait
- Plates heating
- Platens Cooling
By pressing the green button for each line of the cycle-preparation page you can select the type of operation to be performed and activates the corresponding setting parameters.

The commands allow you to manage the operations of mold closing, degassing, waiting during the vulcanization time, opening at the end of the cycle.
For all these operations it is possible to define the command execution time by setting the time in minutes, seconds and tenths of a second.

If your press is equipped with the Closing Force Control option, it is possible to prepare molding cycles by defining the force to be applied to the mold in each step.
In this case the menu allows you to define both the duration and the force to be applied for each cycle step.
The definition of the duty cycle can be combined with the definition of the thermal cycle to obtain elaborate combined cycles.



For each molding cycle you can define the Pre-set temperature to which the machine must be adjusted before the activation of the molding cycle is enabled.
This function guarantees repeatable molding conditions and high repeatability of the results obtained.
When the press is used in combination with the Gibitre Press-Control software, the preparation of the machine is carried out automatically based on the queue of products to be printed set in the software.
The tolerance limits for reaching the expected pre-set temperature can be set as needed.

Each heating step within a molding cycle allows to define:
- The temperature to be reached
- The thermal gradient (° C / min) with which to reach the required temperature. The temperature control PLC automatically adjusts the heating to achieve the required temperature change rate.
The heating elements installed on the press allow to obtain a Thermal Gradient up to 15 °C/min (the thermal mass of the mold and of the product to be heated can reduce the real heating rate obtainable).
In the same cycle, several temperature set operations can be inserted to configure the desired thermal cycle.
If the thermal gradient is not defined, the heating rate is optimized to reach the desired temperature in the shortest possible time.

The cooling of the tops is necessary for the molding of thermoplastic products.
If your press is equipped with a cooling device, it is possible to set the automatic cooling phases of the plates.
Each cooling step within a molding cycle allows to define:
- The temperature to be reached
- The thermal gradient (° C / min) with which to reach the required temperature. The temperature control PLC automatically adjusts the flow of the cooling fluid independently in the two planes to achieve the required temperature change rate.


























